27th Aerospace Sciences Meeting 1989
DOI: 10.2514/6.1989-417
|View full text |Cite
|
Sign up to set email alerts
|

Mars Rover Sample Return mission

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3

Citation Types

0
4
0

Year Published

1989
1989
2008
2008

Publication Types

Select...
4
4

Relationship

0
8

Authors

Journals

citations
Cited by 15 publications
(4 citation statements)
references
References 0 publications
0
4
0
Order By: Relevance
“…That study is focused on understanding the system requirements and generating the first-order system design that meets these requirements [2,3]. The mission requires orbiters, landers and a Rover in Mars orbit and/or on the Mars surface.…”
Section: Introductionmentioning
confidence: 99%
“…That study is focused on understanding the system requirements and generating the first-order system design that meets these requirements [2,3]. The mission requires orbiters, landers and a Rover in Mars orbit and/or on the Mars surface.…”
Section: Introductionmentioning
confidence: 99%
“…That study is focused on understanding the system requirements and generating the firstorder system design that meets these requirements [2]. The mission requires orbiters, landers and a Rover in Mars orbit and/or on the Mars surface.…”
Section: Introductionmentioning
confidence: 99%
“…Quick changes may be needed in the software implementing traverse and sample acquisition functions after landing, whether due to unforseeable hardware failures or unexpected conditions. Depending of course on the mission design, sample return mission surface stay times could be as short as a few months, adding greatly to pressures for operational responsiveness (Bourke, et al, 1989).…”
mentioning
confidence: 99%