2006
DOI: 10.1109/tpwrs.2006.881127
|View full text |Cite
|
Sign up to set email alerts
|

LP-Based OPF for Corrective FACTS Control to Relieve Overloads and Voltage Violations

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
64
0

Year Published

2008
2008
2022
2022

Publication Types

Select...
7
3

Relationship

0
10

Authors

Journals

citations
Cited by 107 publications
(64 citation statements)
references
References 27 publications
0
64
0
Order By: Relevance
“…Most of the control methods are available at transmission level and substation level. At the transmission level actions such as switching of transmission lines [5], using flexible Ac transmission system (FACTS) devices like static synchronous compensator (STATCOM), A static VAR compensator (SVC) and unified power flow controller (or UPFC) which are electrical devices for providing fast-acting reactive power compensation on high-voltage electricity transmission networks [1,8,9,14]. At sub station level synchronous condensers and shunt capacitors are used.…”
Section: Literature Surveymentioning
confidence: 99%
“…Most of the control methods are available at transmission level and substation level. At the transmission level actions such as switching of transmission lines [5], using flexible Ac transmission system (FACTS) devices like static synchronous compensator (STATCOM), A static VAR compensator (SVC) and unified power flow controller (or UPFC) which are electrical devices for providing fast-acting reactive power compensation on high-voltage electricity transmission networks [1,8,9,14]. At sub station level synchronous condensers and shunt capacitors are used.…”
Section: Literature Surveymentioning
confidence: 99%
“…In comparison with other corrective control strategies i.e. load shedding and generation rescheduling; the utilization of FACTS device is a more economic solution, since it has lower operational cost and no extra cost will involve for the charge in generation and load [3,4]. This paper presents a computational intelligences technique namely: Particle Swarm Optimization (PSO) and Evolutionary Programming (EP) for optimal location of Static Var Compensator (SVC) and Thyristor Controlled Series Compensator (TCSC) installation in the power system network.…”
Section: Introductionmentioning
confidence: 99%
“…A FACTS device can control power flow and increase the transmission capacity effectively. Several techniques have been proposed in the past for the adjustment of controllable series capacitor to alleviate line overloads [1]- [3].…”
Section: Introductionmentioning
confidence: 99%