Lot Streaming Flow Shop with a Heterogeneous Machine

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
7
0

Year Published

2020
2020
2024
2024

Publication Types

Select...
8

Relationship

1
7

Authors

Journals

citations
Cited by 9 publications
(7 citation statements)
references
References 33 publications
0
7
0
Order By: Relevance
“…The idle time TOk is modified (equation 18), by incorporating the variable Y i,j,k,l . The same happens with energy consumption (TEC) (equation 19). Then, restrictions (20)-(25) have a similar interpretation to that of the SBS + EA model (equations (13)-(17)), with the difference that now the duration of the processing can be modified for each sublot i of each job j.…”
Section: Breakdown Of Z (Equation 1) In Terms Of Sbsi+eamentioning
confidence: 84%
See 2 more Smart Citations
“…The idle time TOk is modified (equation 18), by incorporating the variable Y i,j,k,l . The same happens with energy consumption (TEC) (equation 19). Then, restrictions (20)-(25) have a similar interpretation to that of the SBS + EA model (equations (13)-(17)), with the difference that now the duration of the processing can be modified for each sublot i of each job j.…”
Section: Breakdown Of Z (Equation 1) In Terms Of Sbsi+eamentioning
confidence: 84%
“…For this, the studies that have used similar approaches were taken as a starting point [10] [13]. Regarding the parameterization related to lot-streaming, it was considered similar works from literature [18] [19]. The sizes of the problems studied considered 5 and 10 machines, and 3, 5 and 7 jobs were used for each number of machines.…”
Section: Experimental Designmentioning
confidence: 99%
See 1 more Smart Citation
“…Consistent: If the lot size is the same for each pair of machines, with this type of batches work [17,21,34,38,41,42,[48][49][50][51]57,59,61,64,[67][68][69]75].…”
Section: Types Of Sublots or Jobsmentioning
confidence: 99%
“…For solving the general HFSP scheduling problem and its variants, many approaches have been developed to obtain the optimal or near-optimal solutions [12][13][14]. These approaches include exact algorithms [15,16], heuristic methods [17,18] and meta-heuristics methods [3,11].…”
Section: Literature Reviewmentioning
confidence: 99%