volume 237, issue 12-13, P1429-1436 2007
DOI: 10.1016/j.nucengdes.2006.09.036
View full text
|
|
Share

Abstract: The double-ended-guillotine break (DEGB) criterion of the largest primary piping system in the plant, which generally provides the limiting condition for the emergency core cooling system requirements, is widely recognized as an extremely unlikely event. As a result, US Nuclear Regulatory Commission (NRC) staff are currently considering a risk-informed revision of the design-basis break size requirements for commercial nuclear power plants. In support of this effort, loss-of-coolant accident (LOCA) frequency e…

expand abstract