2023
DOI: 10.1093/imaman/dpad020
|View full text |Cite
|
Sign up to set email alerts
|

Joint maintenance and spare-parts inventory models: a review and discussion of practical stock-keeping rules

Phil Scarf,
Aris Syntetos,
Ruud Teunter

Abstract: Accepted by: M. Zied Babai It is natural to coordinate spare-parts inventory planning and maintenance. However, work in the former area often neglects part utilization, and work in the latter neglects the fact that effective execution of maintenance schedules is conditioned to the availability of the necessary spare parts. This paper is a call for further integration between the two areas, and to that end, we review the literature on mathematical modelling and analysis of inventory-maintenance-p… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2024
2024
2024
2024

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(1 citation statement)
references
References 172 publications
0
1
0
Order By: Relevance
“…Our study, therefore, ignores managerial and operational costs of in-house and outsourced repair. See, in contrast, [7] that optimizes the stock management and ignores the inventory cost and [8] that considers maintenance and inventory jointly. Therefore, the practical decision of whether to repair in-house or outsource repair should weigh possible managerial advantages of outsourcing against the cost of additional spares needed to maintain the required system performance.…”
Section: Introductionmentioning
confidence: 99%
“…Our study, therefore, ignores managerial and operational costs of in-house and outsourced repair. See, in contrast, [7] that optimizes the stock management and ignores the inventory cost and [8] that considers maintenance and inventory jointly. Therefore, the practical decision of whether to repair in-house or outsource repair should weigh possible managerial advantages of outsourcing against the cost of additional spares needed to maintain the required system performance.…”
Section: Introductionmentioning
confidence: 99%