2019
DOI: 10.1002/smr.2183
|View full text |Cite
|
Sign up to set email alerts
|

Investigating the factors which impact SPI implementation initiatives in software SMEs—A systematic map and review

Abstract: Context: For successful initiation of software process improvement (SPI) initiatives in software SMEs, it is vital for the practitioners to have deep understanding of various SPI inhibitors.Objective: The paper has the following objectives: investigate factors which impact SPI implementation initiatives in software SMEs, synthesize available evidence, identify gaps between existing approaches available in the literature, and to develop the taxonomy of the factors.Methods: Database search and snowballing proced… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
13
0

Year Published

2020
2020
2022
2022

Publication Types

Select...
6

Relationship

0
6

Authors

Journals

citations
Cited by 11 publications
(14 citation statements)
references
References 55 publications
0
13
0
Order By: Relevance
“…These cost drivers have a very negligible impact on the cost. The same criteria are followed in a similar study [38]. These cost drivers could be neglected based on their low significance value.…”
Section: Factors With Low Significant Impact On Costmentioning
confidence: 99%
“…These cost drivers have a very negligible impact on the cost. The same criteria are followed in a similar study [38]. These cost drivers could be neglected based on their low significance value.…”
Section: Factors With Low Significant Impact On Costmentioning
confidence: 99%
“…Quality assessment in SLR is carried out to analyze the credibility, quality, rigorousness and relevance of reporting of primary studies. Following the threshold value given in [51], the primary studies had an overall score higher than 40% were considered for further process. Based on this criterion none of the studies was left out.…”
Section: Quality Criteria For Study Selectionmentioning
confidence: 99%
“…14 The objective of the model was to improve on software discipline in project cases that were multicontractor or multilayered. 47 The basis of the model is the capability of the organization or the project, with respect to five levels 48 . Each of these levels has a set of processes that are defined within them.…”
Section: T a B L Ementioning
confidence: 99%