2020
DOI: 10.1016/j.autcon.2020.103114
|View full text |Cite
|
Sign up to set email alerts
|

Integrating and managing BIM in 3D web-based GIS for hydraulic and hydropower engineering projects

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

1
32
0

Year Published

2020
2020
2023
2023

Publication Types

Select...
5
3

Relationship

0
8

Authors

Journals

citations
Cited by 67 publications
(43 citation statements)
references
References 15 publications
1
32
0
Order By: Relevance
“…OCCT can be involved in the whole process of information visualization, but in this study, it mainly functions at step 1 and step 2 for reading and processing IFC geometries into buffers that are to be sent to the GPU API. Buffers can be sent to OpenGL in a desktop-based system or WebGL in a webbased system [63,64]. These buffers contain primitive geometric information that is to be displayed on a computer screen; therefore, extracting and interpreting these buffers is vital to this study.…”
Section: Computer Graphics and Occtmentioning
confidence: 99%
See 1 more Smart Citation
“…OCCT can be involved in the whole process of information visualization, but in this study, it mainly functions at step 1 and step 2 for reading and processing IFC geometries into buffers that are to be sent to the GPU API. Buffers can be sent to OpenGL in a desktop-based system or WebGL in a webbased system [63,64]. These buffers contain primitive geometric information that is to be displayed on a computer screen; therefore, extracting and interpreting these buffers is vital to this study.…”
Section: Computer Graphics and Occtmentioning
confidence: 99%
“…These shape objects contain very primitive elements of geometry, referred to as triangulation elements in OCCT. They are originally supposed to be sent to the GPU for visualization [64]. These shape objects were closely examined in this study, and a method was developed to rebuild B-Rep from these primitive elements.…”
Section: Extracting and Converting Ifc Geometry Using Occtmentioning
confidence: 99%
“…However, some studies such as [59] that use simulation tool with no performance measures are considered empirically validated in this study, because these kinds of studies have some simulation data. On the other hand, we identified 23 (41.82%) studies that are empirically validated, which are [12]- [19], [21], [22], [49]- [51], [57]- [59][31]- [33], [35], [39], [41], [52].…”
Section: G Rq7: Are the Selected Studies Empirically Validated?mentioning
confidence: 99%
“…Furthermore, we also observed that most of the highly cited studies such as [12], [13], [45], [56]- [58], [60] are published in the top two countries (China and United Kingdom). [10], [13], [20], [47], [48], [50], [56]- [59][30], [31], [39], [41] 14…”
Section: ) Geographical Distribution Of the Selected Studiesmentioning
confidence: 99%
“…The modelling of IBIM cloud data is the basis for optimizing the data collection and management of 3D models. The relevant research mainly focuses on the reverse engineering of BIM from point cloud, as well as the virtual reconstruction and simulation of existing buildings [17][18][19][20]. Based on point cloud technology, Ma et al [21] developed an automatic O&M method for datacenters, which excels in antiinterference and data storage.…”
Section: Introductionmentioning
confidence: 99%