“…The synthesis of the literature identifies that TM in construction falls into four stages, namely: Identification of tolerance requirements/risks, called 'IDENTIFICATION' hereafter [5,15,20,27,38,57,58]; planning the achievement of tolerance requirements/mitigating tolerance risks, called 'PLANNING' hereafter [5,15,17,20,27,38,[57][58][59]; communication of tolerance information, called 'COMMUNICATION' hereafter [5,15,18,20,27,38,40,[57][58][59]; and tolerance compliance control, called 'CONTROL' hereafter [17,20,27,40,57,60]. For clarity, tolerance requirements concern dimensional and geometric properties of components [37].…”