2020
DOI: 10.1016/j.cie.2020.106673
|View full text |Cite
|
Sign up to set email alerts
|

Integrated resource leveling and material procurement with variable execution intensities

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1

Citation Types

0
2
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
7
1

Relationship

0
8

Authors

Journals

citations
Cited by 11 publications
(3 citation statements)
references
References 33 publications
0
2
0
Order By: Relevance
“…They propose a genetic algorithm (GA) for the solution of the problem. Kazemi and Davari-Ardakani [24] proposed a multi-objective model that integrates project scheduling and raw material purchasing simultaneously and solved it with NSGA-II and Taguchi. Kannan et al [14] proposed a multi-criteria decision-making (MCDM) approach called Fuzzy Axiomatic Design (FAD) to select the best green supplier for a Singaporebased plastic manufacturing company for purchase and supply cycle to ensure the supplier of goods and meeting of green criteria.…”
Section: Literature Reviewmentioning
confidence: 99%
“…They propose a genetic algorithm (GA) for the solution of the problem. Kazemi and Davari-Ardakani [24] proposed a multi-objective model that integrates project scheduling and raw material purchasing simultaneously and solved it with NSGA-II and Taguchi. Kannan et al [14] proposed a multi-criteria decision-making (MCDM) approach called Fuzzy Axiomatic Design (FAD) to select the best green supplier for a Singaporebased plastic manufacturing company for purchase and supply cycle to ensure the supplier of goods and meeting of green criteria.…”
Section: Literature Reviewmentioning
confidence: 99%
“…They propose a genetic algorithm (GA) for the solution of the problem. Kazemi and Davari-Ardakani [23] proposed a multi-objective model that integrates project scheduling and raw material purchasing simultaneously and solved it with NSGA-II and Taguchi. Kannan et al [13] proposed a multi-criteria decision-making (MCDM) approach called fuzzy axiomatic design (FAD) to select the best green supplier for a Singapore-based plastic manufacturing company for purchase and supply cycle to ensure the supplier of goods and meeting of green criteria.…”
Section: Literature Reviewmentioning
confidence: 99%
“…Applying the new technique to resource management is a prerequisite for construction contractors in today's complex construction environment [4]. An appropriate method for resource management could determine the high level of project success to avoid project delay and cost overrun [5,6].…”
Section: Introductionmentioning
confidence: 99%