1999
DOI: 10.1002/(sici)1099-1425(199901/02)2:1<3::aid-jos16>3.0.co;2-0
|Get access via publisher |Summarize |Cite
Installing an urban transport scheduling system
Abstract: Bus and driver scheduling methods developed by the authors and their associates form the basis of the leading British commercial scheduling system installed for many organizations throughout the 1980s. New research in the 1990s led to more advanced systems. This paper describes the transition from these research‐based systems which had been demonstrated to operating companies through to the implementation of a fully operational system for an urban bus company. After outlining the bases of the scheduling method…
Search citation statements
Paper Sections
Select...
7
1
0
0
Citation Types
0
4
0
0
Year Published
2000
2019
Publication Types
Select...
6
1
1
Relationship
2
6
Authors
Journals
Cited by 8 publications
(4 citation statements)
References 16 publications
0
4
0
0
“…BOOST, its successor, has been used in some feasibility studies involving bus companies in the United Kingdom and Brazil. Wren and Kwan (1999) report an application for one United Kingdom bus company, whose main depot in the city centre has been relocated to a new site. They satisfactorily used BOOST to re‐schedule their entire new operation.…”
Section: Integrated Bus Transit Scheduling For Bjbusmentioning
confidence: 99%
“…BOOST, its successor, has been used in some feasibility studies involving bus companies in the United Kingdom and Brazil. Wren and Kwan (1999) report an application for one United Kingdom bus company, whose main depot in the city centre has been relocated to a new site. They satisfactorily used BOOST to re‐schedule their entire new operation.…”
Section: Integrated Bus Transit Scheduling For Bjbusmentioning
confidence: 99%
“…The above exercises, and some subsequent projects, were carried out by our in-house team on behalf of clients. The first application of the system in Reading [24], only three months after TRACS II had been ordered, resulted in an annual…”
Section: Experiencesmentioning
confidence: 99%
“…The VAMPIRES algorithm is now incorporated in the BOOST bus-scheduling module, part of the Schedules Office comprehensive scheduling system. A recent application is described in [3].…”
Section: Train and Bus Schedulingmentioning
confidence: 99%
