All Days 2013
DOI: 10.2118/165355-ms
|View full text |Cite
|
Sign up to set email alerts
|

Injection Scheduling Design for Reduced Order Waterflood Modeling

Abstract: In this paper we use the concept of experimental design from the System Identification literature and introduce a novel methodology for more accurate characterization and monitoring of waterfloods using linear models. To improve the predictability of the low order linear models they must be trained with sufficiently informative data. To achieve this goal, the input (here injection rate) must contain sufficient variations (without exceeding the technical and operational limits) so that all the relevant dynamics… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2

Citation Types

0
5
0
1

Year Published

2014
2014
2018
2018

Publication Types

Select...
5
1

Relationship

0
6

Authors

Journals

citations
Cited by 10 publications
(6 citation statements)
references
References 5 publications
0
5
0
1
Order By: Relevance
“…Eqs. B-1 and B-2 are the weak forms of the material balance for two-phase immiscible flow of water and oil (Walsh and Lake 2003). To obtain the total-fluid material balance, we expand Eqs.…”
Section: Resultsmentioning
confidence: 99%
See 1 more Smart Citation
“…Eqs. B-1 and B-2 are the weak forms of the material balance for two-phase immiscible flow of water and oil (Walsh and Lake 2003). To obtain the total-fluid material balance, we expand Eqs.…”
Section: Resultsmentioning
confidence: 99%
“…For a mature waterflood, the PI is a function of rock properties, fluid properties. and well properties but not of pressure or time (Walsh and Lake 2003). Therefore, it is reasonable to consider the PI as a constant if there is no dramatic change in reservoir/ well conditions.…”
Section: Resultsmentioning
confidence: 99%
“…As studied by Tafti et al [65], the identification of the CRM parameters and their underlying uncertainty are intrinsically related to:…”
Section: Crm Sensitivity To Data Quality and Uncertainty Analysismentioning
confidence: 99%
“…Thus, ideally, it would not be necessary to change injection rates or producers' BHP merely for the identification of the CRM parameters. However, if in any circumstances it is desired to improve the information content of the input/output signals, the studies of Tafti et al [65] and Moreno and Lake [66] provide guidelines based on systems identification theory. The approach developed by Tafti et al [65] relies on previous information of the systems dynamics, which might be acquired through well test, for example, to define criteria for sampling time, frequency and amplitude of variations and experimental length.…”
Section: Crm Sensitivity To Data Quality and Uncertainty Analysismentioning
confidence: 99%
“…、电容模型 [5~11] 、多井生产指数 [12] 、流动网络 模型 [13] 和井间数值模拟模型 [14,15] 等. 其中, 电容模型是 基于水电相似和物质平衡原理得出的注入速度时滞 模型, 它通过连通系数、时滞常数、产液指数等表征 油藏产液数据变化, 理论基础坚实、易于编程且表征 参数物理意义明确, 可较好适应于油藏管理和实时优 化调整, 已广泛用于弹性驱 [16] 、水驱 [17,18] 、气驱 [16,19] 及CO2地质埋存 [20] 等领域.…”
unclassified