Fuel cycles optimization of nuclear power industry in China

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
9
0

Year Published

2019
2019
2023
2023

Publication Types

Select...
7
1

Relationship

0
8

Authors

Journals

citations
Cited by 19 publications
(9 citation statements)
references
References 10 publications
0
9
0
Order By: Relevance
“…e SNF will be transported to a centralized dry storage, and, after the construction of a high-level repository, will be finally transported to that repository, as shown in Figures 3 and 4. OCDE 1994 [30] Charpin et al [29] Bunn 2003 [28] BCG 2006 [27] Ramana and Suchitra [26] De Roo and Parsons [25] Park et al [24] Ko and Gao [23] Recktenwald and Deinert [22] OCDE 2013 [21] Brinton and Kazimi [20] Zhou et al [19] Kim et al [18] Kim et al [17] Gao et al [16] Ganda et al [15] Zhang et al [14] Choi et al [13] Kim et al [12] Kim et al [11] Gao et al [10] Zhang et al [9] Yue et al [8] Chen et al [7] Krasnorutskyy and Kirsanova [6] International models Models applied classification (%)…”
Section: Site Status and Decommissioning Process Of Barakah Sitementioning
confidence: 99%
See 1 more Smart Citation
“…e SNF will be transported to a centralized dry storage, and, after the construction of a high-level repository, will be finally transported to that repository, as shown in Figures 3 and 4. OCDE 1994 [30] Charpin et al [29] Bunn 2003 [28] BCG 2006 [27] Ramana and Suchitra [26] De Roo and Parsons [25] Park et al [24] Ko and Gao [23] Recktenwald and Deinert [22] OCDE 2013 [21] Brinton and Kazimi [20] Zhou et al [19] Kim et al [18] Kim et al [17] Gao et al [16] Ganda et al [15] Zhang et al [14] Choi et al [13] Kim et al [12] Kim et al [11] Gao et al [10] Zhang et al [9] Yue et al [8] Chen et al [7] Krasnorutskyy and Kirsanova [6] International models Models applied classification (%)…”
Section: Site Status and Decommissioning Process Of Barakah Sitementioning
confidence: 99%
“…OCDE 1994 [30] Charpin et al [29] Bunn 2003 [28] BCG 2006 [27] Ramana and Suchitra [26] De Roo and Parsons [25] Park et al [24] Ko and Gao [23] Recktenwald and Deinert [22] OCDE 2013 [21] Brinton and Kazimi [20] Zhou et al [19] Kim et al [18] Kim et al [17] Gao et al [16] Ganda et al [15] Zhang et al [14] Choi et al [13] Kim et al [12] Kim et al [11] Gao et al [10] Zhang et al [9] Yue et al [8] Chen et al [7] Krasnorutskyy and Kirsanova……”
Section: Materials Flows Dynamicmentioning
confidence: 99%
“…Additionally, now the reason for the sharp cost increase observed below TRU mass/TRU mass EPR~0 .272 in the Pareto front in Figure 2 becomes clear: it is produced by the introduction of ADS during the burning phase as it is showed by the orange points in Subfig. (5,4).…”
Section: Reference Solution Without Uncertaintymentioning
confidence: 99%
“…With the continuing increase in economy in today's society, the demand for energy keeps growing, corresponding to the shortage of fossil fuel supplies and restrictions on greenhouse gas emissions. Research shows that China's nuclear power will step into a period of rapid development in the coming decades (Zeng et al, 2016;Yue et al, 2018). While nuclear power projects are under development, the safety and reliability of nuclear power plants are of vital importance.…”
Section: Introductionmentioning
confidence: 99%