2019
DOI: 10.1007/978-3-030-05861-6_112
|View full text |Cite
|
Sign up to set email alerts
|

Freeze-Lining Formation in Submerged Arc Furnaces Producing Ferrochrome Alloy in South Africa

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1

Citation Types

0
4
0

Year Published

2020
2020
2024
2024

Publication Types

Select...
3

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(4 citation statements)
references
References 15 publications
0
4
0
Order By: Relevance
“…Freeze lining is selected currently by many producers because of its longer life time and low maintenance. A sketch of freeze lining is shown in Figure 7 (Steenkamp et al 2019). Dong et al (2014) have simulated the corrosion profile of freeze linings in a FeNi furnace.…”
Section: Modelling Of Lining and Refractory Of Safmentioning
confidence: 99%
See 2 more Smart Citations
“…Freeze lining is selected currently by many producers because of its longer life time and low maintenance. A sketch of freeze lining is shown in Figure 7 (Steenkamp et al 2019). Dong et al (2014) have simulated the corrosion profile of freeze linings in a FeNi furnace.…”
Section: Modelling Of Lining and Refractory Of Safmentioning
confidence: 99%
“…Freeze lining is selected currently by many producers because of its longer life time and low maintenance. A sketch of freeze lining is shown in Figure 7 (Steenkamp et al 2019).
Figure 7 Thermal freeze-lining model-section through furnace sidewall (Steenkamp et al 2019).
…”
Section: Modelling Of Lining and Refractory Of Safmentioning
confidence: 99%
See 1 more Smart Citation
“…In facts, the formation of a freeze lining at reactors walls is a key design aspect for several operating furnaces, from flash smelters to top submerged lance (TSL) furnaces. [1][2][3] The presence of solid slag on the walls acts as a protective layer for the refractory lining, therefore increasing its life. Nikolic et al reported an increase in the campaign life of a TSL furnace from 65 to 215 weeks, 4 obtained with a specific development project focusing on the reactor cooling and operating point.…”