2013
DOI: 10.1016/j.enconman.2013.07.053
|View full text |Cite
|
Sign up to set email alerts
|

Experimental validation of a real time energy management system for microgrids in islanded mode using a local day-ahead electricity market and MINLP

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
180
0
1

Year Published

2016
2016
2023
2023

Publication Types

Select...
6
2

Relationship

1
7

Authors

Journals

citations
Cited by 218 publications
(181 citation statements)
references
References 32 publications
0
180
0
1
Order By: Relevance
“…Theoretically, the fifth harmonic current by the harmonic generator injected into power grid should be the sum of the fifth harmonic current absorbed by the PDTF I f5 with the fifth harmonic current remaining in power gird after filtering, i.e., I h5 = I f5 + I s5 . However, due to the influences of fluctuations in power grid and background harmonic current, the sum of I f5 and I s5 slightly deviates from I h5 in the test [27]. When the capacitance of filter capacitor is constant, the control signal of PDTF (approximately 5300) basically remains unchanged.…”
Section: Impact Of Filter Capacitor's Capacitance On Filtering Performentioning
confidence: 97%
“…Theoretically, the fifth harmonic current by the harmonic generator injected into power grid should be the sum of the fifth harmonic current absorbed by the PDTF I f5 with the fifth harmonic current remaining in power gird after filtering, i.e., I h5 = I f5 + I s5 . However, due to the influences of fluctuations in power grid and background harmonic current, the sum of I f5 and I s5 slightly deviates from I h5 in the test [27]. When the capacitance of filter capacitor is constant, the control signal of PDTF (approximately 5300) basically remains unchanged.…”
Section: Impact Of Filter Capacitor's Capacitance On Filtering Performentioning
confidence: 97%
“…Furthermore, the research work presented in this paper is a continuation of the work by the authors [14], where a framework for considering nondeterministic polynomial-hard (NP-hard) problem with the cheaper version of the software is needed. Moreover, the global optimal solution in the fastest possible time which is an important issue in real-time application development is achieved in comparison with [14]. In this study, a general CEMS framework with a plug-and-play structure is proposed to minimize the operation cost of H-MG.…”
Section: Introductionmentioning
confidence: 99%
“…Primarily EMS should be able to satisfy plug-and-play operation particularly in larger H-MGs with different players, as such to the EMS should adapt itself to real-time changes in the type and capacity of generation and storage assets. In this study, a comprehensive CEMS is proposed to overcome the problems discussed above where the plug-and-play operation is provided [14,17]. In this study, single ownership is considered to simplify the market structure and optimization analysis with features like, e.g., plug-and-play type real-time optimal operation.…”
Section: The Proposed Cemsmentioning
confidence: 99%
See 1 more Smart Citation
“…A small power system consisting of power converter-based generation, ES devices, small classic synchronous generation, and various types of loads forms a microgrid (MG) [4]. While a number of research works on MG have been done on various aspects, including control strategy [5][6][7][8][9][10], energy management systems [11][12][13][14][15][16][17], marketing policies [18][19][20][21] and system design [22][23][24][25][26][27], this paper mainly focuses on the optimal sizing of Distributed Energy Resources (DERs), especially the capacity of ES devices in MG.…”
Section: Introductionmentioning
confidence: 99%