The purpose of this study is to propose a consecutive manufacturing process system to secure the productivity of excellent STKN540B steel tube in the respect of economy and safety as the supporting material for mega structures such as building, bridge and ship. The components of consecutive manufacturing are press-bending, orbital auto welding and steel tube correction. By using STKN540B a high-strength steel material with low yield point that requires a special manufacturing process unlike other steel materials, an actual tube manufacturing is carried out at each stage in this experimental study. With this, the quality of steel tube and the efficiency of the manufacturing process are analyzed to draw out some points to improve in the future.