“…Unlike the traditional power grid, the PIoT features two-way communication between smart meters and traditional meters and data systems [2]. To this end, the PIoT system must monitor the power signal in real-time and ensure the Electrical Supply System's (ESS) stability [3]. However, online message exchange also implants threats into the smart grid, such as monitoring, tampering, and counterfeiting [4,5].…”
Section: Introductionmentioning
confidence: 99%
“…Unlike the traditional power grid, the PIoT features two-way communication between smart meters and traditional meters and data systems [2]. To this end, the PIoT system must monitor the power signal in real-time and ensure the Electrical Supply System's (ESS) stability [3]. However, online message exchange also implants threats into the smart grid, such as monitoring, tampering, and counterfeiting [4,5].…”
Section: Introductionmentioning
confidence: 99%
“…The state of charge (SOC) of supercapacitors and batteries are shown in Equations ( 1) and (2). SOC represents the ratio of residual capacity to total capacity.…”
Section: Mathematical Model Of Hessmentioning
confidence: 99%
“…There are three braking modes for high-speed railway locomotives: Mechanical braking, air braking and regenerative braking. When the locomotive uses regenerative braking, the three-phase asynchronous motor is converted to a generator, and the kinetic energy of the locomotive is converted into electric energy, which is fed back to the traction network, and has the characteristics of large instantaneous power and energy [1,2]. Taking CRH380BL EMU as an example, the maximum power generated by regenerative braking of the train can reach 8MW, and the regenerative braking energy is about 10%-30% of the traction energy of the train [3].…”
Section: Background and Significancementioning
confidence: 99%
“…When the technology of RPC or combined co-phase power supply are used to suppress the negative sequence current, it is necessary to use certain active power flow to suppress negative sequence current [24][25][26]. As the use of single-phase AC-DC-AC converter device, it is difficult to achieve by changing active power flow through the technology of RPC or combined co-phase power supply, when the negative sequence current generated by the equipment of PLPSS is more.…”
Section: Introductionmentioning