2016
DOI: 10.1049/iet-est.2015.0025
|View full text |Cite
|
Sign up to set email alerts
|

Energy evaluation of the power network of a DC railway system with regenerating trains

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
51
0

Year Published

2018
2018
2023
2023

Publication Types

Select...
4
3
1

Relationship

1
7

Authors

Journals

citations
Cited by 69 publications
(51 citation statements)
references
References 35 publications
(41 reference statements)
0
51
0
Order By: Relevance
“…Renewable energies can conveniently be integrated to the RES with the aid of AC/DC and DC/DC converter modules. Energy storage facilities along the traction line can store the surplus energy, as well as energy from the braking system [14][15][16], which can be utilized by accelerating trains or can also be shared with metropolitan DC railways. Although [2] provides brief information about the basic architecture, advantages, and control of the system, in simulations, equally-spaced trains are considered on the traction line; this is the best-case scenario for a droop control scheme, as each VSC TSS encounters a similar traction line resistance and shares an equal amount of power to the system (simulated in Section 5).…”
Section: System Topologymentioning
confidence: 99%
“…Renewable energies can conveniently be integrated to the RES with the aid of AC/DC and DC/DC converter modules. Energy storage facilities along the traction line can store the surplus energy, as well as energy from the braking system [14][15][16], which can be utilized by accelerating trains or can also be shared with metropolitan DC railways. Although [2] provides brief information about the basic architecture, advantages, and control of the system, in simulations, equally-spaced trains are considered on the traction line; this is the best-case scenario for a droop control scheme, as each VSC TSS encounters a similar traction line resistance and shares an equal amount of power to the system (simulated in Section 5).…”
Section: System Topologymentioning
confidence: 99%
“…In the literature, the concept of audit appears in a different context. The first of these concerns the verification of safety management systems (SMS), the implementation of which is required, among others, infrastructure managers [12][13][14]. The audits also concern activities related to technical maintenance of control command and signalling equipment [15].…”
Section: Audit Of the Railway Linementioning
confidence: 99%
“…Another context is the design of property security systems for travellers [16]. An important group of audits are also energy [14,17,18], organization [19], environmental [20][21][22][23][24] and financial audits [25]. Audit also plays a very important role in maintenance systems that are used on the railways [26][27][28][29].…”
Section: Audit Of the Railway Linementioning
confidence: 99%
“…B. Mohamed, P. Arboleya and C. Gonzalez-Moran [7] have provided a method called a Modified Current Injection to solve the electric railway power flow, whether the substations were reversible or non-reversible. Different simulation methods for electric railways were provided in [8], [9], [10], [11] and [12]. However, all of them were able to just provide the trains contact voltages, and not the track voltage.…”
Section: Takedownmentioning
confidence: 99%