2018
DOI: 10.1016/j.apenergy.2017.11.046
|View full text |Cite
|
Sign up to set email alerts
|

Energy-efficient HVAC management using cooperative, self-trained, control agents: A real-life German building case study

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
26
0

Year Published

2018
2018
2021
2021

Publication Types

Select...
6
3
1

Relationship

1
9

Authors

Journals

citations
Cited by 50 publications
(34 citation statements)
references
References 41 publications
0
26
0
Order By: Relevance
“…The most important for future developments is of course the • forthright tuning. Promising experiments with a greenhouse [30] and a building [33] comfort this hope. It would confirm thanks also to [7] that model-free control should become important in computer science (compare with [3], [23], [25]).…”
Section: Discussionmentioning
confidence: 99%
“…The most important for future developments is of course the • forthright tuning. Promising experiments with a greenhouse [30] and a building [33] comfort this hope. It would confirm thanks also to [7] that model-free control should become important in computer science (compare with [3], [23], [25]).…”
Section: Discussionmentioning
confidence: 99%
“…2 The optimization methods for the HVAC system mainly include model-based and modelfree methods. 3,4 In model-based methods, several researchers have devoted efforts to HVAC system optimization for minimizing energy consumption. For example, Lu et al 5,6 proposed a global optimization for HVAC systems.…”
Section: Introductionmentioning
confidence: 99%
“…[1,2] In most cases, energy saving in construction, as a rule, is considered at the design phase of new construction or at the stage of their modernization or reconstruction. [3,4] At the same time, a considerable amount of electricity, heat, fuel and other energy resources are consumed during the construction and installation works, aimed to build new object, and providing the household maintenance of the builders involved in the process. A significant part of these expenses are operating costs on construction machines and mechanisms.…”
Section: Introductionmentioning
confidence: 99%