Economic planning approach for electric vehicle charging stations integrating traffic and power grid constraints

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
19
0

Year Published

2019
2019
2023
2023

Publication Types

Select...
5
4

Relationship

0
9

Authors

Journals

citations
Cited by 60 publications
(31 citation statements)
references
References 29 publications
(7 reference statements)
0
19
0
Order By: Relevance
“…The BGA is a stochastic search algorithm based on the concept of natural selection and genetics [32]. In the past, many authors have applied BGA for optimal sitting and sizing of EV CSs because of its ability to deal with both continuous and discrete variables and with linear and nonlinear objective functions compared with other evolutionary techniques [33], [34], [35]. For this reason, the proposed CS planning model chose BGA to solve the multiobjective optimization problem.…”
Section: A Optimization Toolsmentioning
confidence: 99%
“…The BGA is a stochastic search algorithm based on the concept of natural selection and genetics [32]. In the past, many authors have applied BGA for optimal sitting and sizing of EV CSs because of its ability to deal with both continuous and discrete variables and with linear and nonlinear objective functions compared with other evolutionary techniques [33], [34], [35]. For this reason, the proposed CS planning model chose BGA to solve the multiobjective optimization problem.…”
Section: A Optimization Toolsmentioning
confidence: 99%
“…Voronoi edge Voronoi vertex grid constraints [17]. In those cases, Voronoi decomposition helped to find an optimised spatial division based on the considered planning zones.…”
Section: Voronoi Polygon Of P Imentioning
confidence: 99%
“…LOLP indicates the probability that the available power, at any time, is less than the load demand. LOLP is defined by (18) as the ratio of time intervals in which the generation is less than the demand to total time horizon. According to (19), LOLP is constrained by an upper limit:…”
Section: Reliability Constraintmentioning
confidence: 99%
“…Considering the increased tendency to integrate the PEVs on the MGs, optimal planning of production and consumption of electrical energy in an MG in the presence of PEVs is very important. It should be noted that most of the studies reported on the topic have focused on the effect of PEVs on MG operation, whereas only a few of them focused on MG planning for decreasing the operational cost [17][18][19][20].…”
Section: Introductionmentioning
confidence: 99%