Proceedings of the Fourth International Conference on Computer Integrated Manufacturing and Automation Technology
DOI: 10.1109/cimat.1994.389036
|View full text |Cite
|
Sign up to set email alerts
|

Dynamic capacity allocation in manufacturing systems with significant setup times

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Publication Types

Select...
2
1

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(1 citation statement)
references
References 6 publications
0
1
0
Order By: Relevance
“…In the first case it is not possible to keep the system with empty buffers at all times and a large literature investigated around interesting stability issues like the existence and stability of limit cycles in the buffer content space ( [1][2][3][4][5][6][7][8][9]). Optimization problems have been defined for this class of systems to minimize a cost function which includes a backlog, a surplus and a setup component.…”
Section: Introductionmentioning
confidence: 99%
“…In the first case it is not possible to keep the system with empty buffers at all times and a large literature investigated around interesting stability issues like the existence and stability of limit cycles in the buffer content space ( [1][2][3][4][5][6][7][8][9]). Optimization problems have been defined for this class of systems to minimize a cost function which includes a backlog, a surplus and a setup component.…”
Section: Introductionmentioning
confidence: 99%