2019
DOI: 10.31897/pmi.2019.6.686
|View full text |Cite
|
Sign up to set email alerts
|

Development of Scada-model for trunk gas pipeline's compressor station

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
4
0

Year Published

2020
2020
2024
2024

Publication Types

Select...
7

Relationship

0
7

Authors

Journals

citations
Cited by 14 publications
(4 citation statements)
references
References 0 publications
0
4
0
Order By: Relevance
“…Thus, at present, the main factor limiting the longwall productivity is the high methane emission from the coal seam 50. It should be noted that the use of advance and preliminary degassing of the mined coal seam 50, as shown by the experience of its use in the mining of the coal seam 52, is low effective, and the costs of such degassing are very high [8][9][10]. In addition, with increasing depth, the cost of degassing the mined coal seam increases, and its efficiency decreases [11][12][13][14].…”
Section: Resultsmentioning
confidence: 99%
“…Thus, at present, the main factor limiting the longwall productivity is the high methane emission from the coal seam 50. It should be noted that the use of advance and preliminary degassing of the mined coal seam 50, as shown by the experience of its use in the mining of the coal seam 52, is low effective, and the costs of such degassing are very high [8][9][10]. In addition, with increasing depth, the cost of degassing the mined coal seam increases, and its efficiency decreases [11][12][13][14].…”
Section: Resultsmentioning
confidence: 99%
“…Kite-based power generators can be installed in remote locations where the utility grid is not available [46]. The kite power system in combination with battery storage system [47] can also be employed in remote locations where an uninterrupted power supply is necessary [48,49]. From the simulated graphs, we can understand the dynamics of the system for a specific wind profile and a kite-based system can be designed based on the requirements.…”
Section: Discussion and Applicationsmentioning
confidence: 99%
“…And also, most importantly, it makes it possible to model solutions to various geodetic problems [10] associated with hazardous production, whether it is an executive survey when aligning crane tracks, or creating a model of the terrain of oil fields. Especially relevant today is the task of geodetic monitoring of the technical condition of the underwater crossing of gas pipelines, this is evidenced by the work of the authors [11][12][13][14][15][16]. The modern gas supply system on the territory of the Russian Federation is a well-developed main gas pipeline network.…”
Section: Introductionmentioning
confidence: 99%