Abstract: The practical development of the algorithm for optimal control of mine ventilation was preceded by comprehensive studies of the specific features of mining sites in order to obtain their mathematical description. The latter includes the static and dynamic characteristics of objects, i.e. the relationship between input and output values. The purpose of the research: to develop methods and management tools aerogasdynamics processes on mining sites of coalmines. Research methods. The methodology based on the syst… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

1
11
0

Year Published

2021
2021
2022
2022

Publication Types

Select...
8

Relationship

1
7

Authors

Journals

citations
Cited by 15 publications
(12 citation statements)
references
References 0 publications
1
11
0
Order By: Relevance
“…When solving such a problem, the primary methods are the available seismic data, built on their basis maps of natural fracturing, the direction of development of the network of natural fractures -as an indicator of the direction of the minimum horizontal stress and possible zones of anisotropy of the reservoir, certain tectonic disturbances -faults, faults, shears and thrusts, data of core studies and tests of MiniFrakov for wells located in the study area and which are typical for it [4][5][6].…”
Section: Methodsmentioning
confidence: 99%
“…When solving such a problem, the primary methods are the available seismic data, built on their basis maps of natural fracturing, the direction of development of the network of natural fractures -as an indicator of the direction of the minimum horizontal stress and possible zones of anisotropy of the reservoir, certain tectonic disturbances -faults, faults, shears and thrusts, data of core studies and tests of MiniFrakov for wells located in the study area and which are typical for it [4][5][6].…”
Section: Methodsmentioning
confidence: 99%
“…-short circuit on the buses of workshop substations. At the same time, the power supply interruption time is the sum of the short circuit disconnection time on the supply line and the ASR operation time at the substation [4][5][6][7][8][9];…”
Section: Methodsmentioning
confidence: 99%
“…Two sections of substation No. 12 are powered by 5 motors with a capacity of 320 kW, one motor with a capacity of 400 kW [4][5][6]. Communication between substations No.…”
Section: Brief Description Of the Power Supply Circuit For Motors With A Voltage Of 6 Kvmentioning
confidence: 99%
“…Thus, the juice concentration unit will perform two tasks at the same time: concentrating itself and working as an additional refrigeration unit for cooling process liquids [8][9][10].…”
Section: Description Of the Vacuum Concentration Unitmentioning
confidence: 99%