2020
DOI: 10.15507/2658-4123.030.202004.659-682
|View full text |Cite
|
Sign up to set email alerts
|

Development of a Trainable Classifier of State of Rail Lines with Multiple Patterns of Image Recognition

Abstract: Introduction. The necessity to classify the state of rail lines affected by significant damaging factors on the sensitive element of the information sensor providing the assurance of classification quality with the required length of the rail lines of the control section forms the task of creating a classifier with extended functionality. Extending the functionality is possible using multidimensional state images with a set of informative features and training procedures for classification models. Using the cl… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2021
2021
2023
2023

Publication Types

Select...
2
2

Relationship

1
3

Authors

Journals

citations
Cited by 4 publications
(1 citation statement)
references
References 16 publications
(3 reference statements)
0
1
0
Order By: Relevance
“…In the equipotential state of the rail line (RL) scheme, the current does not flow through the earth path, but if the equipotentiality is violated, the current begins to flow through the earth path from the source to the receiver. This feature is especially necessary to take into account when constructing intelligent train traffic control systems, when it is impossible to ensure invariance to perturbations affecting the rail line survey signal additively or parametrically (Tarasov, 2017;Tarasov et al, 2020).…”
Section: Introductionmentioning
confidence: 99%
“…In the equipotential state of the rail line (RL) scheme, the current does not flow through the earth path, but if the equipotentiality is violated, the current begins to flow through the earth path from the source to the receiver. This feature is especially necessary to take into account when constructing intelligent train traffic control systems, when it is impossible to ensure invariance to perturbations affecting the rail line survey signal additively or parametrically (Tarasov, 2017;Tarasov et al, 2020).…”
Section: Introductionmentioning
confidence: 99%