1997
DOI: 10.1002/(sici)1099-1247(199707/08)15:4<141::aid-sat580>3.0.co;2-q
|Get access via publisher |Summarize |Cite
|
Sign up to set email alerts

Delay analysis for interlan traffic using two suitable TDMA satellite access schemes

Abstract: Two demand assignment time division multiple access (TDMA) satellite access schemes that are suitable for providing flexible interconnections of local area networks are compared by means of two simulations; Fifo Ordered Demand Assignment/Information Bit Energy Adaptive (FODA/IBEA) and Combined Fixed Reservation Assignment (CFRA). A unique simulation tool was used, a meshed network of very small aperture terminals (VSATs) under the control of a master station was considered and similar networking conditions wer… Show more

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
2
0
0

Citation Types

0
2
0
0

Year Published

1999
1999
2016
2016

Publication Types

Select...
4
2

Relationship

0
6

Authors

Journals

citations

Cited by 6 publications

(2 citation statements)
references

References 20 publications

0
2
0
0
Order By: Relevance
“…Celandroni et al have described the concepts and implementation details of a complete fade countermeasure system based on adaptive TDMA, with demand assignment of capacity [7]. Association of an up-link power control feature with the bit and coding rate variation gives the system an interesting ability to cope with fade conditions [3][4][5][6]8]. These studies are of great significance as an adaptation of such modelling to the case of MF-TDMA for DVB-RCS is actually essential.…”
Section: Introductionmentioning
confidence: 99%
Exaggerated anticipatory anxiety is common in social anxiety disorder (SAD). Neuroimaging studies have revealed altered neural activity in response to social stimuli in SAD, but fewer studies have examined neural activity during anticipation of feared social stimuli in SAD. The current study examined the time course and magnitude of activity in threat processing brain regions during speech anticipation in socially anxious individuals and healthy controls (HC). Method Participants (SAD n = 58; HC n = 16) underwent functional magnetic resonance imaging (fMRI) during which they completed a 90s control anticipation task and 90s speech anticipation task.
“…Celandroni et al have described the concepts and implementation details of a complete fade countermeasure system based on adaptive TDMA, with demand assignment of capacity [7]. Association of an up-link power control feature with the bit and coding rate variation gives the system an interesting ability to cope with fade conditions [3][4][5][6]8]. These studies are of great significance as an adaptation of such modelling to the case of MF-TDMA for DVB-RCS is actually essential.…”
Section: Introductionmentioning
confidence: 99%
Exaggerated anticipatory anxiety is common in social anxiety disorder (SAD). Neuroimaging studies have revealed altered neural activity in response to social stimuli in SAD, but fewer studies have examined neural activity during anticipation of feared social stimuli in SAD. The current study examined the time course and magnitude of activity in threat processing brain regions during speech anticipation in socially anxious individuals and healthy controls (HC). Method Participants (SAD n = 58; HC n = 16) underwent functional magnetic resonance imaging (fMRI) during which they completed a 90s control anticipation task and 90s speech anticipation task.
“…We describe a proof-of-concept implementation, which is completely functional and easy to extend. The prototype is a portable software package, written in C, and has been used in research projects [12,13]. The allocation methods considered by FRACAS may have either centralised or distributed control.…”
Section: Introductionmentioning
confidence: 99%
Exaggerated anticipatory anxiety is common in social anxiety disorder (SAD). Neuroimaging studies have revealed altered neural activity in response to social stimuli in SAD, but fewer studies have examined neural activity during anticipation of feared social stimuli in SAD. The current study examined the time course and magnitude of activity in threat processing brain regions during speech anticipation in socially anxious individuals and healthy controls (HC). Method Participants (SAD n = 58; HC n = 16) underwent functional magnetic resonance imaging (fMRI) during which they completed a 90s control anticipation task and 90s speech anticipation task.
Exaggerated anticipatory anxiety is common in social anxiety disorder (SAD). Neuroimaging studies have revealed altered neural activity in response to social stimuli in SAD, but fewer studies have examined neural activity during anticipation of feared social stimuli in SAD. The current study examined the time course and magnitude of activity in threat processing brain regions during speech anticipation in socially anxious individuals and healthy controls (HC). Method Participants (SAD n = 58; HC n = 16) underwent functional magnetic resonance imaging (fMRI) during which they completed a 90s control anticipation task and 90s speech anticipation task.