2019
DOI: 10.1080/24751448.2019.1640541
|View full text |Cite
|
Sign up to set email alerts
|

Defining Geometry Levels for Optimizing BIM for VR: Insights from Traditional Architectural Media

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2020
2020
2023
2023

Publication Types

Select...
3
3
1

Relationship

0
7

Authors

Journals

citations
Cited by 10 publications
(2 citation statements)
references
References 6 publications
0
2
0
Order By: Relevance
“…VCSs mostly use BIM as an information base to extract the required construction information or geometric models to achieve corresponding functions. However, for the massive amount of BIM information in a project, information retrieval and export consume large amounts of computing power [103]. In the steps of model transformation, information is lost [104].…”
Section: Information Processingmentioning
confidence: 99%
“…VCSs mostly use BIM as an information base to extract the required construction information or geometric models to achieve corresponding functions. However, for the massive amount of BIM information in a project, information retrieval and export consume large amounts of computing power [103]. In the steps of model transformation, information is lost [104].…”
Section: Information Processingmentioning
confidence: 99%
“…Secondly, many detailed issues need to be addressed in the applications. The retrieval and export of various information from projects that contain large amounts of BIM information consume significant computational power [182], whilst during the model conversion steps, information is prone to be lost [148]. Since safety risk management struggles to keep up with the dynamics information of construction sites, the lack of real-time information exchange leads to difficulty in establishing effective information integration and sharing mechanisms [128].…”
Section: Construction Stagementioning
confidence: 99%