2023
DOI: 10.3390/app13137825
|View full text |Cite
|
Sign up to set email alerts
|

Deck Slab Elements for the Accelerated Construction of Steel–Concrete Composite Bridges

Abstract: Various methods have been developed to produce deck slabs for steel–concrete composite bridges. Usually, the deck slabs are cast with in situ concrete using a formwork carriage, resulting in construction progress of 15 to 25 m of deck slab per week. A new construction method was developed at the Institute of Structural Engineering (TU Wien), which enables the swift erection of the concrete deck slab. This method employs precast deck slab elements with reinforced concrete cross-beams which span in the transvers… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
0
0
1

Year Published

2024
2024
2024
2024

Publication Types

Select...
1

Relationship

1
0

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 25 publications
0
0
0
1
Order By: Relevance
“…Für Brücken mit noch größeren Spannweiten von bis zu 80 m werden UHPFRC-Fertigteilsegmentbrücken vorgeschlagen [12]. Fahrbahnplattenelements bei Stahl-Beton-Verbundbrücken wurde bereits ausführlich in [16] beschrieben.…”
Section: Introductionunclassified
“…Für Brücken mit noch größeren Spannweiten von bis zu 80 m werden UHPFRC-Fertigteilsegmentbrücken vorgeschlagen [12]. Fahrbahnplattenelements bei Stahl-Beton-Verbundbrücken wurde bereits ausführlich in [16] beschrieben.…”
Section: Introductionunclassified