2013
DOI: 10.1049/iet-gtd.2013.0031
|View full text |Cite
|
Sign up to set email alerts
|

Comprehensive review of generation and transmission expansion planning

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

0
169
0
6

Year Published

2014
2014
2020
2020

Publication Types

Select...
7
1

Relationship

0
8

Authors

Journals

citations
Cited by 251 publications
(175 citation statements)
references
References 130 publications
0
169
0
6
Order By: Relevance
“…However, separated generation and transmission expansion planning exercises don't guarantee minimizing the overall cost generally. The integration of these problems has been approached using different methods, models, and objective functions (for a review on the topic, see [24]). Our approach can be complementary both to an integrated and a non-integrated analysis.…”
Section: Relevant Literaturementioning
confidence: 99%
“…However, separated generation and transmission expansion planning exercises don't guarantee minimizing the overall cost generally. The integration of these problems has been approached using different methods, models, and objective functions (for a review on the topic, see [24]). Our approach can be complementary both to an integrated and a non-integrated analysis.…”
Section: Relevant Literaturementioning
confidence: 99%
“…However, problem (12) is a constrained optimization problem, which is generally difficult to solve due to the inequality and equality constraints (8)(9)(10)(11)(12). Thus the exact penalty function method [24] is used to transform (12) into an unconstrained optimization problem.…”
Section: Modeling Of the Integrated Planning Problemmentioning
confidence: 99%
“…Thus the exact penalty function method [24] is used to transform (12) into an unconstrained optimization problem. First, inequalities and equalities (8)(9)(10)(11)(12) …”
Section: Modeling Of the Integrated Planning Problemmentioning
confidence: 99%
See 1 more Smart Citation
“…It is inevitable to involve renewable energy in long-term Multi-Region Generation Expansion Planning (MR-GEP) [1]. In long-term MR-GEP, the objective is to expand the existing power system to serve the forecasted load over a planning horizon of typically 10-30 years.…”
Section: Introductionmentioning
confidence: 99%