Collaborative BIM-Based Construction Coordination Progress Modeling Using Extended Collaborative Process Modeling (exCPM)

Jae-Hyung Shim,

Abstract: Agile project management pursues repetitive and continuous management through an empirical process control method considering the complexity of the project. This study aimed to propose a collaborative Building Information Modeling (BIM)-based work process, focusing on construction coordination tasks among participants during the construction phase of a project. The theoretical framework chosen for this endeavor was the Scrum framework, selected after analyzing previous research to align with the specific chara… Show more

Search citation statements

Order By: Relevance

Paper Sections

Select...
12
3
1
0

Citation Types

0
6
0
0

Year Published

Range
2024
2024
2026
2026

Publication Types

Select...
13
2

Relationship

0
15

Authors

Journals

Cited by 15 publications

(6 citation statements)

References 54 publications

0
6
0
0
Order By: Relevance
How the paper below cites the one you are viewing
“…The construction-coordination process proposed by Shim et al (2024) similarly emphasizes the links among continuing review, issue resolution, and progress updates [24]. In the present case, the C1/C2 distinction identifies whether renewed joint judgment and controlled write-back are both documented within such iterations.…”
Section: Discussion
mentioning
confidence: 83%
“…The extension offered here is not the association of a decision with a model element itself, but the separate evidentiary assessment of whether identified technical evidence was used by identified actors in joint judgment (C1) and whether a confirmed outcome was traceably written back to an identified controlled project object (C2). Shim et al model iterative BIM-based coordination workflows; the C1/C2 framework complements this approach by assessing whether these two connections are documented within individual collaborative decision events [24]. Jang et al identify limitations in the model-element-specific information available in native BIM logs [25].…”
Section: Discussion
mentioning
confidence: 99%
“…Alongside these perspectives, process-oriented BIM research has examined coordination workflows, decision documentation, and digital activity traces. Zahedi et al organize design explanations through design episodes and connect them to model elements, while Shim et al model iterative BIM-based construction coordination [19,24]. Jang et al examine the information available in BIM logs and identify limitations in their object-level detail [25].…”
Section: Introduction
mentioning
confidence: 99%
See 2 more Smart Citations