“…More considerations of other performance indicators have been added, including environmental, social impact, quality, and storage costs. A study that examined and compared collaboration with non-collaboration settings showed that CTM provides superior performance and cost benefits when compared to non-collaborative solutions [3]- [4], [11], [16]- [17], [20]- [22], [25]- [31], [33], [35], [37], [36]- [39]. Although we know that the 4C model (4CM) can lower the total cost, it can possibly increase the cost for some parties, and change is almost impossible if there remains a barrier due to human factors.…”