Building Information Modelling (Bim) as an Enabler for Whole-Building Embodied Energy and Carbon Calculation in Early-Stage Building Design

Abstract: In recent years, there has been a worldwide effort to reduce carbon emissions from buildings. Operational energy (OE) reduction has been the main focus of the Industry as it accounts for a greater proportion of carbon emissions throughout the building life and is easier than embodied energy (EE) to predict. However, as OE is reduced, embodied energy and carbon emissions become more significant. Further to this, early-stage design decisions are crucial as they determine a significant portion of a building's lif… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
6
0

Year Published

2019
2019
2024
2024

Publication Types

Select...
8

Relationship

0
8

Authors

Journals

citations
Cited by 9 publications
(6 citation statements)
references
References 16 publications
(17 reference statements)
0
6
0
Order By: Relevance
“…In agreement with Munoz-La Rivera et al [55], the current shortcomings in structural engineering companies (SECs) that hinder their processes and interactions, reduce productivity, and lack collaborative and interconnected processes have been identified. Bentelli et al [56] reviewed the literature on BIM and the role of embedded carbon in early designs, with the aim of informing practice and policy for decarbonization through BIM to achieve wider environmental goals.…”
Section: Semi-automatic Bim Methodologymentioning
confidence: 99%
“…In agreement with Munoz-La Rivera et al [55], the current shortcomings in structural engineering companies (SECs) that hinder their processes and interactions, reduce productivity, and lack collaborative and interconnected processes have been identified. Bentelli et al [56] reviewed the literature on BIM and the role of embedded carbon in early designs, with the aim of informing practice and policy for decarbonization through BIM to achieve wider environmental goals.…”
Section: Semi-automatic Bim Methodologymentioning
confidence: 99%
“…International activities have increasingly centered on reducing building carbon emissions [9]. Operational energy reduction has been the industry's top focus since it has a bigger impact on carbon emissions over the course of a building's lifetime and is easier to predict than embodied energy [10]. Typically, the building performance research should be carried out while taking into account the construction documents and the architectural blueprints [11].…”
Section: Methodsmentioning
confidence: 99%
“…Therefore, without 14 utilizing the BIM technology that cannot allow an effective and better plan for activities of the construction projects in which cannot overcome the potential errors in the design phase. Banteli, & Stevenson (2017) mentioned, delay and cost overrun are the most common risky and complex issues in construction projects. Without the application of BIM in project management, the detection of conflicts and clash analysis cannot be detected.…”
Section: Table 1 the Benefits Of Using Bimmentioning