BIM-based LCA assessment of seismic strengthening solutions for reinforced concrete precast industrial buildings

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
9
0

Year Published

2020
2020
2022
2022

Publication Types

Select...
8
1

Relationship

0
9

Authors

Journals

citations
Cited by 29 publications
(16 citation statements)
references
References 13 publications
0
9
0
Order By: Relevance
“…The reuse of steel is the main source of avoided environmental impact when recycled. Raposo et al [41] developed a structural BIM-based LCA assessment method for seismic reinforcement of precast reinforced concrete in industrial buildings to evaluate and compare the environmental impacts of new construction and seismic reinforcement solutions in an existing building. First, analyzing the respective seismic reinforcement solution took place, then accomplishing the corresponding LCA and finally calculating the LCC for each case.…”
Section: Literature Reviewmentioning
confidence: 99%
“…The reuse of steel is the main source of avoided environmental impact when recycled. Raposo et al [41] developed a structural BIM-based LCA assessment method for seismic reinforcement of precast reinforced concrete in industrial buildings to evaluate and compare the environmental impacts of new construction and seismic reinforcement solutions in an existing building. First, analyzing the respective seismic reinforcement solution took place, then accomplishing the corresponding LCA and finally calculating the LCC for each case.…”
Section: Literature Reviewmentioning
confidence: 99%
“…By increase of BIM software interoperability among team members, more than %65 of the overall annual cost paid by clients, operators and building users has been saved. Also, different parties like software vendors had large benefit on their investment for BIM [28][29][30]. Furthermore BIM is capable of making multiple parties, and other benefits could be bring to the project by team member such as: 3D visualization, full understanding of project requirements, time saving, reduction of construction activities period and reduction of design problems [31][32][33].…”
Section: Bim Benefitsmentioning
confidence: 99%
“…Therefore, these tools are often used in the early design stages to identify the most important impacts. Most of the identified studies that used the plug-in approach for the calculation used the Tally tool [46][47][48][49]. Tally is a Revit plug-in, and it enables LCA analysis by the use of the Gabi database.…”
Section: Classification Of the Integration Process/interoperabilitymentioning
confidence: 99%