2008
DOI: 10.1016/j.aei.2008.06.002
|View full text |Cite
|
Sign up to set email alerts
|

Automated construction activity monitoring system

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
38
0
1

Year Published

2010
2010
2021
2021

Publication Types

Select...
4
3
2

Relationship

0
9

Authors

Journals

citations
Cited by 105 publications
(39 citation statements)
references
References 44 publications
0
38
0
1
Order By: Relevance
“…As reported before [25], that can also be one of the barriers for successful adoption of the disruptive technology.…”
Section: Design Of the Frameworkmentioning
confidence: 99%
“…As reported before [25], that can also be one of the barriers for successful adoption of the disruptive technology.…”
Section: Design Of the Frameworkmentioning
confidence: 99%
“…It was first introduced as an accurate method to capture construction sites and items and has been subsequently used to capture the current status of construction projects (Rebolj et al 2008). Akinci et al (2006) have shown that using 3D sensing and laser scanning technologies can avoid potential errors that cause rework.…”
Section: D Imaging Technologiesmentioning
confidence: 99%
“…Rebolj et al [56] proposed a combined method of capturing real time information during the construction process, consisting of three components: an automated activity tracking subsystem based on image recognition, an automated material tracking subsystem, and a mobile computing supported communication environment. Ibrahim et al [33] reported the use of computer vision technology for the collection of real time construction work packages in the job site.…”
Section: Integration Of Rfid and Wireless Sensor Networkmentioning
confidence: 99%