2013
Application of Fuzzy Logic to Multi-Objective Scheduling Problems in Robotic Flexible Assembly Cells
Abstract: This paper is aimed at developing a methodology to solve a multi-objective problem in robotic flexible assembly cells. The proposed methodology is based on three main steps: (1) scheduling of the RFACs using different common rules, (2) normalisation of the scheduling outcomes, and (3) selection of the optimal scheduling rules, using a fuzzy inference system. In this paper, four rules, namely short processing time, long processing time, earlier due date and random, are examined. Four objectives are considered s…
Search citation statements
Paper Sections
Select...
7
0
0
0
Citation Types
0
1
0
0
Year Published
Range
2014
2026
Publication Types
Select...
3
2
2
Relationship
0
7
Authors
Journals
Cited by 7 publications
(1 citation statement)
References 26 publications
0
1
0
0
Smart CitationsHow the paper below cites the one you are viewing
“…There are several other optimisation algorithms for CM including artificial neural network (Maqableh et al, 2014;Pooranian et al, 2014;Heckerling et al, 2004), fuzzy logic (Abd et al, 2013;Li and Zhang, 2012;Zhang et al, 2014), particle swarm optimisation (PSO) (Pandey et al, 2010;Netjinda et al, 2012;Guo et al, 2012), bee colony optimisation (Bitam, 2012;Mizan et al, 2012), bat algorithm Malakooti et al, 2013).…”
Section: Variations Of Ga
mentioning
confidence: 99%
Abstract