A two-stage sequential planning scheme for integrated operations planning and scheduling system using MILP: the case of an engine assembler

Abstract: This paper presents an operations planning scheme based on mathematical programming models (specifically, Mixed-Integer Linear Programming (MILP) models) integrated into a web-enabled Advanced Planning and Scheduling System (APS), developed for and implemented in an engine assembler that supplies the car industry. One objective of this paper is to provide empirical insights into some operations planning characteristics in the automotive industry. The other main objective is to show MILP models and their use to… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

1
13
0
5

Year Published

2012
2012
2015
2015

Publication Types

Select...
5
1

Relationship

3
3

Authors

Journals

citations
Cited by 31 publications
(22 citation statements)
references
References 43 publications
1
13
0
5
Order By: Relevance
“…The complete case study is presented in [4], but the 4 week procurement model had to evolve because stakeholders needed to consider new considerations like penalty for loss of capacity and the different run out-times of products. Given length constraints, a simple case study will be evaluated: five time periods, four products and three trucks will be considered.…”
Section: Case Studymentioning
confidence: 99%
See 3 more Smart Citations
“…The complete case study is presented in [4], but the 4 week procurement model had to evolve because stakeholders needed to consider new considerations like penalty for loss of capacity and the different run out-times of products. Given length constraints, a simple case study will be evaluated: five time periods, four products and three trucks will be considered.…”
Section: Case Studymentioning
confidence: 99%
“…As Goetschalckx states in [8], Ford Motors Company and General Motors use fullsize pickup truck models, but they are not described. In the automotive sector, the FTL strategy led to overdeliveries (serve in advance), as stated Garcia-Sabater et al [4] in the case of motors distribution planning. Liu et al [9] present 2-phase heuristic algorithms for the full truckloads multi-depot capacitated vehicle routing problem in carrier collaboration, but the consideration of different packaging for different products is not considered.…”
Section: Introductionmentioning
confidence: 97%
See 2 more Smart Citations
“…Julien Maheut Página 130 considering all the feasible alternative solutions in terms of alternative BOMs (Garcia-Sabater et al, 2012a;Lin et al, 2009;Ram et al, 2006).…”
Section: Modelos Y Algoritmos Basados En El Concepto Stroke Para La Pmentioning
confidence: 99%