2020
DOI: 10.1002/2050-7038.12708
|View full text |Cite
|
Sign up to set email alerts
|

A clustering‐based technoeconomic analysis for wind farm and shunt capacitor allocation in radial distribution systems

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
4
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
5
3

Relationship

2
6

Authors

Journals

citations
Cited by 11 publications
(4 citation statements)
references
References 40 publications
0
4
0
Order By: Relevance
“…By considering the reactive power of the capacitor banks (namely Q C (𝜆(n)), the active/reactive power injected into buses is as [39]…”
Section: Load Flow Calculationsmentioning
confidence: 99%
See 1 more Smart Citation
“…By considering the reactive power of the capacitor banks (namely Q C (𝜆(n)), the active/reactive power injected into buses is as [39]…”
Section: Load Flow Calculationsmentioning
confidence: 99%
“…By considering the reactive power of the capacitor banks (namely QC(λfalse(nfalse)${{Q}_C}(\lambda ( n )$), the active/reactive power injected into buses is as [39] P(i)badbreak=PLii$$\begin{equation}P(i) = P_L^i \forall i\end{equation}$$ Q(i)badbreak=QLiiBn$$\begin{equation}Q(i) = Q_L^i \forall i \notin {{B}_n}\end{equation}$$ Q(Bn)badbreak=QLBngoodbreak−QC(n)iBn$$\begin{equation}Q({{B}_n}) = Q_L^{{{B}_n}} - {{Q}_C}(n) \forall i \in {{B}_n}\end{equation}$$in which Pfalse(ifalse)$P( i )$ and Qfalse(ifalse)$Q( i )$ are active/reactive power injected into buses, respectively. In addition, PLi$P_L^i$ and QLi$Q_L^i$ are the active/reactive loads of the system.…”
Section: Load Flow Calculationsmentioning
confidence: 99%
“…The payback period denotes the time required for the return on an investment to repay the total cost of the BESS and is expressed by eqn. ( 22) [40][41].…”
Section: Iiiv Payback Period Calculation For the Bessmentioning
confidence: 99%
“…Additionally, lower energy losses of BDFRMs have been reported in the literature. However, the installing costs such as foundation cost and landing cost are required for all wind turbine types [141]. In addition to wind turbines, BDFRM is a potential solution for the development of Electric Vehicles (EVs), which are an alternative to conventional vehicles.…”
Section: Role Of Bdfrm In Decarbonizationmentioning
confidence: 99%