A project management framework for enhanced productivity performance using building information modelling

Abstract: Although the Singapore government has mandated submissions of building plans in building information modelling (BIM) format since July 2013, this does not yet seem to lead to enhanced productivity performance. BIM collaboration between designers and downstream contractors appears to remain inadequate. While many studies have been conducted on using BIM for better project outcomes, studies that relate BIM with the identification of non-value adding activities in the project lifecycle and the reduction of the re… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
23
0

Year Published

2018
2018
2022
2022

Publication Types

Select...
5
1
1

Relationship

1
6

Authors

Journals

citations
Cited by 29 publications
(25 citation statements)
references
References 21 publications
0
23
0
Order By: Relevance
“…Because of the word limit, this paper could only present the NVA BIM implementation activities and their resulting wastes in building project delivery in Singapore. In phase I of the research project, Liao et al [14] analyzed key BIM implementation activities in the current, partial BIM-based delivery and compared them with their counterparts in an integrated project delivery (IPD) in terms of project phasing and major stakeholders (not presented here). The IPD has materialized as an approach that can most effectively and fully facilitate BIM implementation in building projects, according to Porwal and Hewage [7], the American Institute of Architects, California Council (AIACC) [29], and Piroozfar et al [30].…”
Section: Nva Bim Implementation Activities In Project Deliverymentioning
confidence: 99%
See 1 more Smart Citation
“…Because of the word limit, this paper could only present the NVA BIM implementation activities and their resulting wastes in building project delivery in Singapore. In phase I of the research project, Liao et al [14] analyzed key BIM implementation activities in the current, partial BIM-based delivery and compared them with their counterparts in an integrated project delivery (IPD) in terms of project phasing and major stakeholders (not presented here). The IPD has materialized as an approach that can most effectively and fully facilitate BIM implementation in building projects, according to Porwal and Hewage [7], the American Institute of Architects, California Council (AIACC) [29], and Piroozfar et al [30].…”
Section: Nva Bim Implementation Activities In Project Deliverymentioning
confidence: 99%
“…"Insufficient communication between architect and engineers" (N4.2) in the construction documentation phase was the fourth distinctive activity, with a mean score of 3.73 in the downstream parties and 3.17 in the upfront stakeholders. This was because the consultants might think their designs already met relevant requirements, and, in contrast, the contractors tended not to trust in the designs [14]. The post-survey interviewees emphasized that, actually, in many cases, the consultants' models were messy.…”
Section: Nva Activities Comparison By Project Stakeholdersmentioning
confidence: 99%
“…Free, easy-to-learn, flexible and up-to-date tools were seen to encourage unsophisticated users to embrace new technologies (Nilsiam andPearce, 2017, Mele andPoli, 2017). Technological support refers to the existence of a common data environment and effective data sharing tools among the BIM team members, made available by a technology provider or research institute can facilitate adoption of the new technology (Alreshidi et al, 2017, Liao et al, 2017. In contrast, the inability of the current technology used by industry players to keep pace with the advancement of new technology has been cited as the reason for slow advancement from old to new technology (Alshammari et al, 2018).…”
Section: Literature Reviewmentioning
confidence: 99%
“…The construction industry is challenged to adopt Building Information Modeling (BIM) to improve its performance and to achieve sustainability in the industry (Arayici et al, 2011). Also known as n-Dimensional (n-D) Modeling or Virtual Prototyping Technology (Azhar et al, 2015), BIM refers to a digital presentation that integrates various sets processes, technologies and players in a building or facility lifecycle, aimed at increasing productivity and improving performance (Thomson, 2016, Liao et al, 2017. The visualisation in a 3D model under BIM improves understanding of the proposed project (Liao et al, 2017).…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation