2017
DOI: 10.1016/j.isatra.2017.09.003
|View full text |Cite
|
Sign up to set email alerts
|

A novel optimized hybrid fuzzy logic intelligent PID controller for an interconnected multi-area power system with physical constraints and boiler dynamics

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
34
0

Year Published

2018
2018
2023
2023

Publication Types

Select...
3
3

Relationship

1
5

Authors

Journals

citations
Cited by 69 publications
(34 citation statements)
references
References 31 publications
0
34
0
Order By: Relevance
“…The GRC for the hydro and thermal utilities as well as the GDB for the thermal plants in both control areas are addressed in the system model. Referring to Reference [4], the Fourier coefficients of the governor dead band (GDB) are taken as N 1 = 0.8 and N 2 = −0.2/π. A suitable GRC model of 10%/minute for the thermal utility of Figure 1 is applied to both raising and falling rates.…”
Section: Mathematical Modelling Of Investigated Power Systemmentioning
confidence: 99%
See 4 more Smart Citations
“…The GRC for the hydro and thermal utilities as well as the GDB for the thermal plants in both control areas are addressed in the system model. Referring to Reference [4], the Fourier coefficients of the governor dead band (GDB) are taken as N 1 = 0.8 and N 2 = −0.2/π. A suitable GRC model of 10%/minute for the thermal utility of Figure 1 is applied to both raising and falling rates.…”
Section: Mathematical Modelling Of Investigated Power Systemmentioning
confidence: 99%
“…From Figure 1, the input to the controller is their respective ACEs, and the output is the signal u i . Based on References [3,4], the area control errors (ACEs) of both areas can be formulated as:…”
Section: G1mentioning
confidence: 99%
See 3 more Smart Citations