A New Heuristic Method for Solving Joint Job Shop Scheduling of Production and Maintenance

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

0
5
0

Year Published

2016
2016
2023
2023

Publication Types

Select...
7
1
1
1

Relationship

0
10

Authors

Journals

citations
Cited by 12 publications
(5 citation statements)
references
References 11 publications
0
5
0
Order By: Relevance
“…For the breakdown case, a revised schedule was produced by the right shifting method, and the affected operations were impacted from the time of breakdown on the broken machine. Fnaiech et al (2015) proposed a new heuristic method to address a JSP where machines were subject to fixed PM planning. They combined a Modified Genetic Algorithm (MGA) and Heuristic Displacement of Genes (HDG) to solve the considered problem to minimize 𝑐 đ‘šđ‘Žđ‘„ .…”
Section: Integrated Production-maintenance Scheduling Problem For Job...mentioning
confidence: 99%
“…For the breakdown case, a revised schedule was produced by the right shifting method, and the affected operations were impacted from the time of breakdown on the broken machine. Fnaiech et al (2015) proposed a new heuristic method to address a JSP where machines were subject to fixed PM planning. They combined a Modified Genetic Algorithm (MGA) and Heuristic Displacement of Genes (HDG) to solve the considered problem to minimize 𝑐 đ‘šđ‘Žđ‘„ .…”
Section: Integrated Production-maintenance Scheduling Problem For Job...mentioning
confidence: 99%
“…for flexible job-shop scheduling using heuristic methods cf. (Li, Pan, and Tasgetiren 2014), (Fnaiech et al 2015) and (El Khoukhi, Boukachour, and Alaoui 2017), minimising makes pan under availability constraints cf. (Benttaleb, Hnaien, and Yalaoui 2016), energy-efficient flexible job-shop scheduling cf.…”
Section: Review Of Related Kbm Approachesmentioning
confidence: 99%
“…The objective was to optimize the total profit, which was modelled as production values minus production costs, maintenance costs including PM and replacement costs, as well as tardiness costs. A new heuristic is proposed by [18] to solve the joint JSSP of production and maintenance actions by extending the standard GA with the idea of enhancing its random character by guiding the steps in a logical procedure. In [19], the integrated planning of production, maintenance and quality in deteriorating systems is investigated.…”
Section: B Integrated Production and Maintenance Schedulingmentioning
confidence: 99%