2022
DOI: 10.3390/su142416379
|View full text |Cite
|
Sign up to set email alerts
|

A Multi-Equipment Task Assignment Model for the Horizontal Stripe Pre-Cut Mining Method

Abstract: This paper proposes a multi-equipment task assignment model for the horizontal stripe pre-cut mining method to address the problem of cooperative scheduling operation of multi-equipment in underground metal mines under complex constraints. The model is constructed with multiple objectives, including operation time, operational efficiency, equipment utilization rate, and ore grade fluctuation by considering the constraints of time, space, equipment, and processes. The NSGA-III algorithm is used to obtain the so… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
0
0

Year Published

2023
2023
2023
2023

Publication Types

Select...
2

Relationship

1
1

Authors

Journals

citations
Cited by 2 publications
(4 citation statements)
references
References 28 publications
0
0
0
Order By: Relevance
“…The scheduling decision support algorithm library is dynamic and continuously improved and expanded. Figure 8 shows the existing algorithm library, which includes the following algorithms: Task Assignment Algorithm for Trackless Equipment [23][24][25][26]: Underground mining is a location-discrete, multi-process, and multi-equipment collaborative production process. This algorithm was used to configure equipment and assign tasks under complex underground mining constraints to rationalize the sequence of operations and maximize efficiency and mining succession.…”
Section: Decision Support Algorithm Librarymentioning
confidence: 99%
“…The scheduling decision support algorithm library is dynamic and continuously improved and expanded. Figure 8 shows the existing algorithm library, which includes the following algorithms: Task Assignment Algorithm for Trackless Equipment [23][24][25][26]: Underground mining is a location-discrete, multi-process, and multi-equipment collaborative production process. This algorithm was used to configure equipment and assign tasks under complex underground mining constraints to rationalize the sequence of operations and maximize efficiency and mining succession.…”
Section: Decision Support Algorithm Librarymentioning
confidence: 99%
“…The zone consisted of eight stopes, and the initial plan, shown in Figure 12, was part of the optimal plan created by a multi-equipment task assignment model for the horizontal stripe pre-cut mining method [24].…”
Section: Initial Plan and Basic Datamentioning
confidence: 99%
“…The zone consisted of eight stopes, and the initial plan, shown in Figure 12, was part of the optimal plan created by a multi-equipment task assignment model for the horizontal stripe pre-cut mining method [24]. The main technical parameters of the mining equipment, including the horizontal hole drilling rig, medium-deep hole drilling rig, charging rig, scaling rig, LHD, and bolter, are listed in Table 6.…”
Section: Initial Plan and Basic Datamentioning
confidence: 99%
See 1 more Smart Citation