DOI: 10.1088/1755-1315/690/1/012013 View full text |Buy / Rent full text
|
|

Abstract: Short-term generation scheduling of cascade hydropower stations has always been one of the core tasks of power system operations. However, with the rapid increase of the number of power stations and the complexity of operation constraints, it is facing more and more challenges to quickly obtain practical day-ahead generation schedules. Based on the practical project of Hongshui River, a load-based method for peak operations of cascaded hydropower stations is proposed. The method takes the maximum effective gen… Show more