2008
DOI: 10.1016/j.ssci.2007.02.002
|View full text |Cite
|
Sign up to set email alerts
|

A fuzzy analytic network process (ANP) model to identify faulty behavior risk (FBR) in work system

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

1
55
0

Year Published

2008
2008
2020
2020

Publication Types

Select...
5
4

Relationship

1
8

Authors

Journals

citations
Cited by 150 publications
(56 citation statements)
references
References 25 publications
1
55
0
Order By: Relevance
“…It is also used in the inter-dependent information system project selection process, the quality function deployment process, the project selection problem, personnel selection and for location selection [24÷28]. ANP is used for BOCR analysis, determination of faulty behaviour risks in work and determination of building's energy performance [29,30]. The method is also used for the selection of dispatching rules in an organization and selection of milling machines [9,31].…”
Section: Principles Of Anp and Gra Methods 21 The Anp Methodsmentioning
confidence: 99%
“…It is also used in the inter-dependent information system project selection process, the quality function deployment process, the project selection problem, personnel selection and for location selection [24÷28]. ANP is used for BOCR analysis, determination of faulty behaviour risks in work and determination of building's energy performance [29,30]. The method is also used for the selection of dispatching rules in an organization and selection of milling machines [9,31].…”
Section: Principles Of Anp and Gra Methods 21 The Anp Methodsmentioning
confidence: 99%
“…The risk will be increased in a nonlinear way with the value increasing and we can classify them in an equidistance division way. At the same time, we can get the fact from other studies [35,36] that the FBR will be major risks if their score exceeds 40% of the total score. On the other hand, the effective measures should be taken when the FBR is in major level and the major level score value interval should be expanded to take measures timely.…”
Section: C7 Materialsmentioning
confidence: 95%
“…On the other hand, the effective measures should be taken when the FBR is in major level and the major level score value interval should be expanded to take measures timely. Therefore, based on the requirement of safety management, experience of experts, and other references [36], the FBR value will divide into four degrees.…”
Section: C7 Materialsmentioning
confidence: 99%
“…Unlike AHP, ANP considers the dependency and feedback among the elements of the problem [30]. Hence, ANP models provide more reliability and reality than AHP models [31] and can offer better solutions in a complex multi criteria decision environment [32,33]. Two layers can be defined for an ANP model: 1-The control layer including goal, criteria and decision-making rules; 2-the network layer which includes the network structure which connects factors, sub-factors or alternatives [31,34].…”
Section: Step 3: Ranking Csfs Using Fuzzy Analytic Network Processmentioning
confidence: 99%