2018
DOI: 10.3390/en11081993
|View full text |Cite
|
Sign up to set email alerts
|

A Fully Distributed Approach for Economic Dispatch Problem of Smart Grid

Abstract: The cooperative, reliable and responsive characteristics make smart grid more popular than traditional power grid. However, with the extensive employment of smart grid concepts, the traditional centralized control methods expose a lot of shortcomings, such as communication congestion, computing complexity in central management systems, and so on. The distributed control method with flexible characteristics can meet the timeliness and effectiveness of information management in smart grid and ensure the informat… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
14
0

Year Published

2019
2019
2022
2022

Publication Types

Select...
7
1

Relationship

2
6

Authors

Journals

citations
Cited by 21 publications
(14 citation statements)
references
References 40 publications
0
14
0
Order By: Relevance
“…IEEE57-bus system contains seven generators units located on buses {1, 2, 3, 6, 8, 9, 12}. Besides, we selected the buses with load power as the load buses, which are all buses except for buses {4, 7,11,21,22,24,26,34,36,37,39,40,45,46, 48} in the IEEE57-bus system. By analyzing the load power data of IEEE57-bus, the summation of the power load could be calculated as P 0 = 1250.8 MW, which was unknown to each individual node.…”
Section: Case 3: Implementation On Ieee 57-bus Systemmentioning
confidence: 99%
See 1 more Smart Citation
“…IEEE57-bus system contains seven generators units located on buses {1, 2, 3, 6, 8, 9, 12}. Besides, we selected the buses with load power as the load buses, which are all buses except for buses {4, 7,11,21,22,24,26,34,36,37,39,40,45,46, 48} in the IEEE57-bus system. By analyzing the load power data of IEEE57-bus, the summation of the power load could be calculated as P 0 = 1250.8 MW, which was unknown to each individual node.…”
Section: Case 3: Implementation On Ieee 57-bus Systemmentioning
confidence: 99%
“…The authors of [36] proposed a distributed algorithm based on consensus-like iterative, and adopted bisection search approach to obtain optimal incremental cost parameter in distributed way. A full decentralized algorithm for EDP is presented in [37], in which a flooding-based consensus method is used to obtain total power demand by communicating with neighbors of each node in the power system. The authors of [38] proposed an optimization algorithm based on auction techniques and consensus protocols to solve EDP with non-convex cost function.…”
Section: Introductionmentioning
confidence: 99%
“…In this paper, multiple versions of particle swarm optimization techniques are used to ascertain the optimal cost of generation capacity that can be integrated into the existing power system and the results of the proposed algorithm for a 30 bus test case system are reported. A new fictitious code based algorithm is developed, in this paper, for equality constraints [1] other than the penalty function methods that performs better due to its parallel search capability.The effect of multiple valves in steam tubines narrated by Singh and Wang et al, [2][3][4] yields more perturbation in cost function which can be piece wise linear using conventional economic dispatch techniques. This methodology is so easy that particle 1925 swarm optimization (PSO) utilizes some parameters and definitions of the optimization process and then it starts the process with an initial random population involving parallel search technique, named particles.…”
Section: Introductionmentioning
confidence: 99%
“…Hence, the operation of BESSs has a significant impact on the performance of the AC distribution network since their inadequate operation can cause excessive cost in operation, deterioration of voltage profile, or increments of power oscillations [5]. For this reason, the economic dispatch of BESSs is an important topic to study and analyze [6,7].…”
Section: Introductionmentioning
confidence: 99%