2022
DOI: 10.1016/j.energy.2022.125057
|View full text |Cite
|
Sign up to set email alerts
|

A cost-technical profit-sharing approach for optimal energy management of a multi-microgrid distribution system

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
2

Citation Types

0
5
0

Year Published

2023
2023
2024
2024

Publication Types

Select...
5
1

Relationship

2
4

Authors

Journals

citations
Cited by 10 publications
(5 citation statements)
references
References 19 publications
0
5
0
Order By: Relevance
“…A perturbation of the load on the demand side with a magnitude of 0.1 p.u at t = 1 s is applied to the closed-loop system, while the simulation length considered to be 50 s (t sim = 50 s). Considering that time to the power of four (t 4 ) is used as a factor in the OC, applying perturbation in the time interval of 0-1 s may release the controller for large initial deviations. To model the FO operators, the FOMCON plugin is used in MATLAB [41], where the frequency range of the operators is set in the range of [0.001, 10000] and the approximation order is equal to 5.…”
Section: Simulation and Numerical Studymentioning
confidence: 99%
See 2 more Smart Citations
“…A perturbation of the load on the demand side with a magnitude of 0.1 p.u at t = 1 s is applied to the closed-loop system, while the simulation length considered to be 50 s (t sim = 50 s). Considering that time to the power of four (t 4 ) is used as a factor in the OC, applying perturbation in the time interval of 0-1 s may release the controller for large initial deviations. To model the FO operators, the FOMCON plugin is used in MATLAB [41], where the frequency range of the operators is set in the range of [0.001, 10000] and the approximation order is equal to 5.…”
Section: Simulation and Numerical Studymentioning
confidence: 99%
“…We investigate the effects of various control strategies on performance by altering the maximum contribution values normalΔPRLsmax${{\Delta}}P_{RLs}^{max}$ of all loads in the set of RLs. It is normal that not all planned loads will be accessible during a system disruption [4]. The effects of RLs participation are evaluated in situations with maximum variations of 2%, 5%, and 10%.…”
Section: Simulation and Numerical Studymentioning
confidence: 99%
See 1 more Smart Citation
“…The management of MMGDN with the approach of optimal exploitation of the common coupling point of MGs has been studied in Reference 20. In Reference 9, the effects of DRPs on the changes in operating and management costs of DNs consisting of several MGs have been studied from the perspective of technical and economic indicators. The scheduling and operation of multicarrier systems that include energy hubs with diverse types of power sources, using the Cournot competitive game strategy and taking into account the DRP and the ESSs, is of the recent studies in the area of energy systems management 21 .…”
Section: Introductionmentioning
confidence: 99%
“…Also, reserve market optimization considering uncertainties is conducted for an islanded MG. 8 Since they can increase system resilience and allow for more efficient resource sharing, MMG systems have been increasingly popular in recent years. 9,10 The optimal management of a multi-MG system has been described and researched as a linear problem with an objective of enhancing the system's self-healing capacity. 11 The effects of the distribution system, the wholesale market, and the impact of demand-side management technologies are not taken into account in this article.…”
Section: Introductionmentioning
confidence: 99%