A bi-level stochastic scheduling optimization model for a virtual power plant connected to a wind–photovoltaic–energy storage system considering the uncertainty and demand response

Abstract: To reduce the uncertain influence of wind power and solar photovoltaic power on virtual power 11 plant (VPP) operation, robust optimization theory (ROT) is introduced to build a stochastic scheduling 12 model for VPP considering the uncertainty, price-based demand response (PBDR) and incentive-based 13 demand response (IBDR). First, the VPP components are described including the wind power plant (WPP), 14 photovoltaic generators (PV), convention gas turbine (CGT), energy storage systems (ESSs) and demand 15 re… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
104
0
1

Year Published

2016
2016
2020
2020

Publication Types

Select...
7
1

Relationship

3
5

Authors

Journals

citations
Cited by 243 publications
(105 citation statements)
references
References 33 publications
0
104
0
1
Order By: Relevance
“…The proposed models could be solved by mixed integer nonlinear programming method and the simplified solution has been described in the existing literature [6].…”
Section: Vpp Joint Scheduling Optimization Modelmentioning
confidence: 99%
See 2 more Smart Citations
“…The proposed models could be solved by mixed integer nonlinear programming method and the simplified solution has been described in the existing literature [6].…”
Section: Vpp Joint Scheduling Optimization Modelmentioning
confidence: 99%
“…However, wind and solar photovoltaic power generation are significantly influenced by environmental and climatic factors, which makes their output strongly volatile and uncertain and has a large influence on power grid scheduling and operation [4,5]. The research conducted on this problem has mainly focused on power system day-ahead scheduling with wind and solar photovoltaic power grid connection [6,7] and ancillary service (AS) decision [8,9].…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation
“…The trading model considers the uncertainty of stochastic variables of the VPP. In the direction of moderating the uncertain effects of wind and solar units in a VPP, a robust optimization is presented in [46] to produce a stochastic model considering DR. In [47], a stochastic approach is offered for VPPs considering diverse uncertainties in generation units, electricity consumption and price.…”
Section: Operation Systems Of Vppmentioning
confidence: 99%
“…In addition, various studies have been performed. In [1][2][3][4][5], the control strategies for the output smoothing through linkage of the BESS and renewable energy were discussed. In [6][7][8][9], the energy management strategy using a BESS were discussed.…”
Section: Introductionmentioning