2020
DOI: 10.1590/s1678-86212020000100370
|View full text |Cite
|
Sign up to set email alerts
|

Building condition assessment: adjustments of the Building Performance Indicator (BPI) for university buildings in Brazil

Abstract: The Building Performance Indicator (BPI), not fully applied in Brazil, expresses objectively the overall condition of a building based on the performance assessment of the building systems that comprise it. Although BPI was originally developed for hospital facilities, it can be used in different types of buildings since its methodology is generic. The objective of the study is to adjust the BPI to allow its application in the maintenance management of Brazilian university buildings. The stages of the research… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2

Citation Types

0
2
0

Year Published

2020
2020
2023
2023

Publication Types

Select...
4
1
1

Relationship

0
6

Authors

Journals

citations
Cited by 9 publications
(2 citation statements)
references
References 14 publications
0
2
0
Order By: Relevance
“…Some researchers used visual surveys and questionnaires to assess the condition of building components. In the scoring scale, Eweda et al [11] and Leite et al [13] used the same scale, which was a percentage. At the same time, Ho et al [14] used a scale of 0 to 1.…”
Section: Assessment Model Of Building Conditionmentioning
confidence: 99%
See 1 more Smart Citation
“…Some researchers used visual surveys and questionnaires to assess the condition of building components. In the scoring scale, Eweda et al [11] and Leite et al [13] used the same scale, which was a percentage. At the same time, Ho et al [14] used a scale of 0 to 1.…”
Section: Assessment Model Of Building Conditionmentioning
confidence: 99%
“…Although they used the same method, the three researchers had different research objectives. Leite et al [13] assessed university buildings in Brazil to determine maintenance priorities. Therefore, data on the building maintenance budget over several years were needed in his research.…”
Section: Assessment Model Of Building Conditionmentioning
confidence: 99%