2017
DOI: 10.1590/s1678-86212017000300169
|View full text |Cite
|
Sign up to set email alerts
|

Construction delays: a case study in the Brazilian Amazon

Abstract: he construction industry is one of the industrial sectors with the lowest rates of fulfilment of contract deadlines, especially in developing countries. This fact has been the focus of considerable discussions seeking to identify the causes of the delays. The main purpose of this paper is to use factor analysis to identify the factors that are correlated with delay, contemplating exclusively residential real estate projects and using a city in the Brazilian Amazon as a case study. Based on the database from th… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
5
0
3

Year Published

2019
2019
2021
2021

Publication Types

Select...
7

Relationship

1
6

Authors

Journals

citations
Cited by 10 publications
(8 citation statements)
references
References 43 publications
(56 reference statements)
0
5
0
3
Order By: Relevance
“…The present work is a research evolution previously published in scientific journal "Ambiente Construído", see Maués et al (2017). The research consisted of a case study based on quantitative and qualitative information of residential buildings from several construction companies operating in Northern Brazil, in order to propose a hybrid modeling method based on factorial analysis and Fuzzy systems to assist decision makers to forecasting the construction duration of vertical residential works (with multiple floors) still at the stage of analysis of economic and financial feasibility of the project.…”
Section: Methodsmentioning
confidence: 99%
See 2 more Smart Citations
“…The present work is a research evolution previously published in scientific journal "Ambiente Construído", see Maués et al (2017). The research consisted of a case study based on quantitative and qualitative information of residential buildings from several construction companies operating in Northern Brazil, in order to propose a hybrid modeling method based on factorial analysis and Fuzzy systems to assist decision makers to forecasting the construction duration of vertical residential works (with multiple floors) still at the stage of analysis of economic and financial feasibility of the project.…”
Section: Methodsmentioning
confidence: 99%
“…For the elaboration of the proposed model, initially a theoretical revision was made in several articles that deal with the theme of the term of execution of work. From this research it was possible to extract among the most cited authors, the factors that influence the execution period of an enterprise, see more details in Maués et al (2017).…”
Section: Definition Of Variables and Data Collectionmentioning
confidence: 99%
See 1 more Smart Citation
“…Nesse contexto, percebe-se que os atrasos de obras públicas são recorrentes em vários países nos quais se encontram causas com características semelhantes para a realização de aditivos de prazo de contrato. Esse fato é corroborado pelo trabalho de Maués et al (2017), que afirmam que esse problema também acontece em países desenvolvidos, devido à existência de problemas estruturantes que levam à ocorrência dos atrasos nas obras. Todavia, há possibilidades de se melhorar o processo de gestão de obras, visando minimizar essas ocorrências, que, entre outros aspectos, acarretam perdas de eficiência e de resultados dos empreendimentos.…”
Section: Prazo E Custo De Obrasunclassified
“…As alterações de contrato, muitas vezes, podem resultar em prejuízos para a administração pública, seja pelo impedimento do início das atividades previstas na nova edificação devido ao atraso na entrega (MAUÉS et al, 2017;FILIPPI;MELHADO, 2015), problema também identificado por autores de outros países, como Larsen et al (2016), na Dinamarca, e Mahamid (2013), na Palestina, seja pelos prejuízos econômicos gerados pela má programação do custo final de um empreendimento, fatos que geram a necessidade de realizar empenhos adicionais para que os projetos sejam concluídos. Esta situação é corroborada nas pesquisas realizadas por Flyvbjerg, Holm e Buhl (2002), na Dinamarca, Senouci, Ismail e Eldin (2016), no Qatar, Shehu et al (2014), na Malasia, e Sweis et al (2008) e Aragão (2015), no Brasil, entre outros.…”
Section: Introductionunclassified