2020
DOI: 10.1109/access.2020.3011750
|View full text |Cite
|
Sign up to set email alerts
|

Novel Piezoelectric Emergency Opening Sub-System to Improve the Safety and Reliability of Zero-Holding-Energy Permanent Magnet Magnetic Contactors

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(1 citation statement)
references
References 49 publications
0
1
0
Order By: Relevance
“…If the actual service life of a device is 3 years, when selecting a relay, workers only need to ensure that the service life of the relay is greater than 3 years to ensure the reliability of the device. (6) A screening test is traditionally used to test relay reliability, but it usually takes a long time and has a high cost. The methods used to evaluate product operating lives in recent years can be divided into two types.…”
Section: Introductionmentioning
confidence: 99%
“…If the actual service life of a device is 3 years, when selecting a relay, workers only need to ensure that the service life of the relay is greater than 3 years to ensure the reliability of the device. (6) A screening test is traditionally used to test relay reliability, but it usually takes a long time and has a high cost. The methods used to evaluate product operating lives in recent years can be divided into two types.…”
Section: Introductionmentioning
confidence: 99%